This is the underneath of the 3rd bedroom floor from the kitchen
![]() |
This is the roof from the kitchen. There are about three or four old wasps nests and one of them is huge, about 30cm long and wide.
![]() |
The kitchen with the opened up chimneybreast
![]() |
The new bathroom covered in dust and soot
![]() |
It scrubbed up well although probably not for long. Alan has cut the door to size and fitted it so it should keep most of the mess out, hopefully.
![]() |
I think the damp proofing has been redone, as there was lots of drilling going on last week (according to our neighbour).
Alan is turning out to be quite a handyman. He has emptied the water tank that was pushing down on the beams in bedroom 3 so it should be fixed this week and a new ceiling put up.
The kitchen should also be re-plastered after a little more brickwork to the chimneybreast.
Just wanted to post one more picture. The bedroom fireplace is still not quite finished but nearly there.
![]() Off to bed now. I'm not used to this hard work so I'm shattered. |
No comments:
Post a Comment